back to beermachine.com 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 view next page
back to beermachine.com 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8
2 OPERATING PRESSURE TEST Fill  The  Beer  Machine  with  fresh  cold
tap drinking water  to fill line and tight-
en down the top cap. Wipe dry around
where the spigot is attached as well as the
main  seal  and  clamps.  Create  a  cup  of
fine soap suds by using one tablespoon
of  liquid  dishwashing  soap,  and  four
tablespoons  warm  water.  Stir  to  create
fine bubbles. Apply solution to the fol-
lowing areas
1) where  carbonation  unit  is  attached
     to The Beer Machine.
2) around the top cap where it fastens
     to The Beer Machine, and
3) pour a small amount of water onto
     the top cap (1/4" depth) to cover the
     ‘pressure control valve’ “P.C.V.”
Pressurize The Beer Machine by intro-
ducing two or three small bursts of CO2.
Look for water leaks; if any appear, it is
likely due to incorrect installation of/or a
missing,  washer  or  seal;  reassembly  or
tightening will be required.
Now test for “gas” leaks. Add more small
bursts of CO
2                          until bubbles pop from the
center of the “P.C.V.”, this indicates it is
reaching full operating pressure. Observe
for  bubbles  popping  over  a  one  to  two
minute period. None should appear, other
than a slow release from the center of the
“P.C.V.” To complete test, pour out one
or two cups of water from the spigot and
observe valve closing, (by the absence of
bubbles).  When  satisfied  that  The  Beer
Machine  is  operating  correctly,  empty
contents and proceed to Preparation For
Brewing - Sterilization.
If  “P.C.V.”  releases at low pressure or
only one or two bursts of CO2, check to
be sure defoamer cup is firmly attached
and in position against the neck seal. If
bubbles of gas leak around the edges (cir-
cumference)  of  the  “P.C.V.”,  reseal  the
edges  of  the  “P.C.V.”  flat  against  the
black lid.
Please  note!  If  bubbles  are  indicating
“air” leakage from any area other than
the center of the “P.C.V.”, or if water
leaks  from  the  main  seal  or  spigot,
examine to determine cause. Tighten-
ing   a   connection   or   re-seating   an
improperly     installed     main     seal
“P.C.V.”  will  correct  the  most  com-
mon faults.
If an air leak appears where the carbona-
tion unit connects to The Beer Machine,
you  may  tighten  the  unit  by  a  quarter
turn and it will operate as well in the hor-
izontal   position.   If   air   leaks   appear
around the top cap, check to be certain
the large flat white ring seal is properly
installed  underneath  the  defoamer  cup
lid, not on the top of the lid.
BEFORE BREWING, it is recommended to first test and be certain your installation of seals and parts
is correct. This is simple and easy to complete in less than ten minutes.
PREPARATION FOR BREWING - STERILIZATION Pour in approximately 3 litres or 3 quarts of cold water and add 1/4 cup of chlorine bleach to The Beer Machine (without
defoamer disk).
Tighten down the top cap. Tilt The  Beer  Machine  in all directions to swirl the solution around the inside of The Beer
Machine. Open the spigot to sterilize float and tube. Remove cap and defoamer cup, place them in a very clean location. Pour
out solution and rinse out with chlorinated tap water. Install defoamer disk after sterilization.
                   The Brewing Process is a biological process sensitive to environment and cleanliness.
The Key to successful brewing is absolute Cleanliness of your equipment!! Begin by Cleaning your hands.
BREWING YOUR BEER 1. WATER/BEER   MIX.   Add   room
temperature water to The Beer Ma-
chine  up  to  1/3  of  fill  line.  Open
and  pour  your  selected  Beer  Mix
into The Beer Machine. Then, add
more  water  up    to  the  fill  line
(located on the side of the top case
half, about 2 inches below the lid).
Do not stir.
2. YEAST. Empty the contents of  the
Brewers Yeast packet into The Beer
Machine. Do not stir. (If yeast has
been    hydrated,    pour    in    the
solution.)  Check  that  the  top  cap
which fits over the pressure control
valve and defoamer cup has the neck
seal in proper position as per figure
4. Secure the cap firmly on the top
of The Beer Machine.
3. FERMENTATION. (a) Keep   The   Beer   Machine   at   a
constant  room  temperature  until
fermentation stops in 3 to 5 days. At
a  temperature  of  68°F   or  20°C,
fermentation will begin within 12 to
24 hours. The best results are often
obtained
with                                    fermentation
between  65°F  and  72°F  or  20°C
and 23°C.  
CAUTION:
Overpressurization  could  result  if
obstruction of the pressure control
valve    occurs    during    a    “hot
fermentation”. If room temperature
exceeds  85°F   the  defoamer  disk
may not be able to fully protect the